The Capanda Dam is a hydroelectric dam on the Kwanza River in Malanje Province, Angola. Built in 1987–2007 years the Russian company Tekhnopromexport, general designer - the institute Hydroproject (Chief Engineer - Ph.D Fedosov V.E.) The facility generates power by utilizing four turbines and each, totalling the installed capacity to . Total cost of US$4 billion. An additional cost of more than US$400 million was spent in repairing the damage caused during UNITA's occupation of the area at the time of the Angolan Civil War in 1992 and 1999.〔(Capanda Dam )〕 == The design == The principal structures include: * concrete gravity dam, which includes: full section of the spillway dam, spillway bottom hydroelectric power plant, * comprising: GES, four tunnel conduit, * power house open switchgear (ORU 220 kW) * administrative building 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Capanda Dam」の詳細全文を読む スポンサード リンク
|